From steel receiving to export release

Flange Manufacturing and Quality Control

Every order follows a recorded production route. Material identity, dimensions, inspection results, marking, packing and shipment documents remain connected from incoming steel to the finished flange.

Heat traceability Dimensional inspection Marking control Export release
Production route

How a flange order moves through the factory

01

Raw material receiving

Incoming bars, billets and forged blanks are matched with the material grade and supplier documents assigned to the order.

Steel billets and raw material prepared for flange production
02

Heat number recording

The original heat number is entered into the production record and carried through cutting, forging, machining and final product marking.

03

Cutting

Steel is cut to the planned blank weight and size. Batch identification stays with the material before it moves to the forging stage.

Steel cutting before flange forging
04

Forging

Heated material is forged into discs or rings for the required flange type. The production route is selected by material, diameter and section size.

Hot steel ring forged on a press
05

Heat treatment

Normalizing, solution treatment or another specified heat-treatment route is completed when required by the grade, standard or purchase order. The applicable record is retained with the batch.

06

Machining

Conventional and CNC lathes machine the outside diameter, thickness, bore, hub and other flange geometry to the production drawing.

CNC machining of forged steel flanges
07

Drilling

Bolt circle diameter, hole quantity and hole diameter are produced to the applicable standard or approved customer drawing.

Bolt hole drilling on a steel flange
08

Facing

RF, FF, RTJ and specified sealing surfaces are machined with the finish and geometry required for the flange standard and service.

09

Dimensional inspection

Inspectors check key dimensions, drilling, bore, thickness, facing and visible surface condition before the batch is released for marking.

Dimensional inspection of a finished flange
10

PMI and NDT

PMI, ultrasonic, magnetic-particle, dye-penetrant or third-party witness inspection is arranged when it forms part of the order. Reports are filed with the inspection package.

11

Marking

Finished flanges are marked with the standard, size, pressure rating, material grade, heat number and manufacturer identification required by the order.

12

Rust protection

Carbon-steel flanges receive anti-rust oil, paint, galvanizing or the specified coating after final inspection and surface preparation.

Anti-rust coating applied to finished flanges
13

Packing

Flanges are separated, wrapped and secured on export pallets or in plywood cases. Labels identify the purchase order, item and package quantity.

Finished flanges packed on export pallets
14

Container loading

Packages are counted against the packing list and secured for the shipment route before the container is closed.

Hyupshin flange packages loaded into a container
15

Shipment documentation

The commercial invoice, packing list, certificate package and agreed inspection records are assembled for dispatch to the buyer.

Quality records

Documents retained with the production and shipment file

Material identityGrade, heat number and incoming material record

Linked to the production batch

Production routeCutting, forging, heat treatment, machining, drilling and facing

Released against the order specification

Inspection recordDimensions, visual condition, PMI, NDT and third-party reports as applicable

Filed before shipment release

Product identificationStandard, size, rating, grade, heat number and manufacturer mark

Transferred to the finished flange

Shipment fileEN 10204 3.1 documents, packing list and agreed inspection records

Prepared for buyer and customs use